West Queue Project GI-2018-17 — Wind in Banner, Nebraska

West Queue Project GI-2018-17 — Wind in Banner, Nebraska is a 501.5 MW wind interconnection project in Banner, Nebraska with a current status of withdrawn. It is proposed to connect at Ault 345 kV Substation.

501.5 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project GI-2018-17 — Wind in Banner, Nebraska
Queue IDGI-2018-17
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity501.5 MW
StateNebraska
CountyBanner
Point of interconnectionAult 345 kV Substation
Requested (queue) date2018-03-27
Proposed in-service date2021-12-01
Operational date
Withdrawn date2020-01-06
Developer
Utility / transmission ownerPublic Service Company Of Colorado

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata