West Queue Project GI-2019-1 — Solar in El Paso, Colorado

West Queue Project GI-2019-1 — Solar in El Paso, Colorado is a 450.0 MW solar interconnection project in El Paso, Colorado with a current status of withdrawn. It is proposed to connect at Comanche-Daniels Park 345 kV Line.

450.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project GI-2019-1 — Solar in El Paso, Colorado
Queue IDGI-2019-1
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity450.0 MW
StateColorado
CountyEl Paso
Point of interconnectionComanche-Daniels Park 345 kV Line
Requested (queue) date2019-02-21
Proposed in-service date2021-12-31
Operational date
Withdrawn date2020-01-06
Developer
Utility / transmission ownerPublic Service Company Of Colorado

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata