West Queue Project GI-2019-10 — Solar+Battery in Weld, Colorado

West Queue Project GI-2019-10 — Solar+Battery in Weld, Colorado is a 200.0 MW solar+battery interconnection project in Weld, Colorado with a current status of withdrawn. It is proposed to connect at Fort Lupton to Pawnee 230 kV Line.

200.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project GI-2019-10 — Solar+Battery in Weld, Colorado
Queue IDGI-2019-10
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity200.0 MW
StateColorado
CountyWeld
Point of interconnectionFort Lupton to Pawnee 230 kV Line
Requested (queue) date2019-10-28
Proposed in-service date2022-06-01
Operational date
Withdrawn date2019-12-05
Developer
Utility / transmission ownerPublic Service Company Of Colorado

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata