West Queue Project GI-2023-169 — Battery in Imperial, California

West Queue Project GI-2023-169 — Battery in Imperial, California is a 90.0 MW battery interconnection project in Imperial, California with a current status of active. It is proposed to connect at 92kV El Centro East Sub.

90.0 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project GI-2023-169 — Battery in Imperial, California
Queue IDGI-2023-169
Statusactive
Source statusactive
MarketWest
TechnologyBattery
Capacity90.0 MW
StateCalifornia
CountyImperial
Point of interconnection92kV El Centro East Sub
Requested (queue) date2023-04-14
Proposed in-service date2025-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerImperial Irrigation District

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata