West Queue Project GI-2023-176 — Geothermal in Imperial, California

West Queue Project GI-2023-176 — Geothermal in Imperial, California is a 157.0 MW geothermal interconnection project in Imperial, California with a current status of active. It is proposed to connect at 230kV Sinclair Sub.

157.0 MWCapacity
ActiveStatus
WestMarket
GeothermalTechnology

Project facts

Canonical nameWest Queue Project GI-2023-176 — Geothermal in Imperial, California
Queue IDGI-2023-176
Statusactive
Source statusactive
MarketWest
TechnologyGeothermal
Capacity157.0 MW
StateCalifornia
CountyImperial
Point of interconnection230kV Sinclair Sub
Requested (queue) date2023-04-28
Proposed in-service date2029-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerImperial Irrigation District

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.