West Queue Project GI-DISIS-2021-06 — Solar in Montezuma, Colorado

West Queue Project GI-DISIS-2021-06 — Solar in Montezuma, Colorado is a 140.0 MW solar interconnection project in Montezuma, Colorado with a current status of suspended. It is proposed to connect at Main Switch 115kV Substation.

140.0 MWCapacity
SuspendedStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project GI-DISIS-2021-06 — Solar in Montezuma, Colorado
Queue IDGI-DISIS-2021-06
Statussuspended
Source statussuspended
MarketWest
TechnologySolar
Capacity140.0 MW
StateColorado
CountyMontezuma
Point of interconnectionMain Switch 115kV Substation
Requested (queue) date2021-05-27
Proposed in-service date2025-10-06
Operational date
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata