West Queue Project GI-DISIS-2021-11 — Solar+Battery in Las Animas, Colorado
West Queue Project GI-DISIS-2021-11 — Solar+Battery in Las Animas, Colorado is a 200.0 MW solar+battery interconnection project in Las Animas, Colorado with a current status of suspended. It is proposed to connect at Windowfield 230kV Switching Station.
Project facts
| Canonical name | West Queue Project GI-DISIS-2021-11 — Solar+Battery in Las Animas, Colorado |
|---|---|
| Queue ID | GI-DISIS-2021-11 |
| Status | suspended |
| Source status | suspended |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 200.0 MW |
| State | Colorado |
| County | Las Animas |
| Point of interconnection | Windowfield 230kV Switching Station |
| Requested (queue) date | 2021-05-28 |
| Proposed in-service date | 2026-09-05 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tri-State Generation and Transmission Association |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.