West Queue Project GI-DISIS-2022-13 — Solar+Battery in Prowers, Colorado

West Queue Project GI-DISIS-2022-13 — Solar+Battery in Prowers, Colorado is a 199.0 MW solar+battery interconnection project in Prowers, Colorado with a current status of active. It is proposed to connect at Lamar 230kV Substation.

199.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project GI-DISIS-2022-13 — Solar+Battery in Prowers, Colorado
Queue IDGI-DISIS-2022-13
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity199.0 MW
StateColorado
CountyProwers
Point of interconnectionLamar 230kV Substation
Requested (queue) date2022-05-27
Proposed in-service date2029-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata