West Queue Project GI-SISS-2025-01 — Battery in Kit Carson, Colorado

West Queue Project GI-SISS-2025-01 — Battery in Kit Carson, Colorado is a 100.0 MW battery interconnection project in Kit Carson, Colorado with a current status of withdrawn. It is proposed to connect at Burlington 230kV Substation.

100.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project GI-SISS-2025-01 — Battery in Kit Carson, Colorado
Queue IDGI-SISS-2025-01
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyBattery
Capacity100.0 MW
StateColorado
CountyKit Carson
Point of interconnectionBurlington 230kV Substation
Requested (queue) date2025-06-02
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata