West Queue Project NC5-002 — Other in Clark, Nevada

West Queue Project NC5-002 — Other in Clark, Nevada is a 499.0 MW other interconnection project in Clark, Nevada with a current status of active. It is proposed to connect at South Crystal 525 kV Switchyard.

499.0 MWCapacity
ActiveStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project NC5-002 — Other in Clark, Nevada
Queue IDNC5-002
Statusactive
Source statusactive
MarketWest
TechnologyOther
Capacity499.0 MW
StateNevada
CountyClark
Point of interconnectionSouth Crystal 525 kV Switchyard
Requested (queue) date2017-05-26
Proposed in-service date2022-06-14
Operational date
Withdrawn date
Developer
Utility / transmission ownerNavajo-Crystal

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata