West Owatonna-AL Corn Dist-Byron 161kV Line (J310)

West Owatonna-AL Corn Dist-Byron 161kV Line is a 200.0 MW wind interconnection project in Dodge County,Steele County, Minnesota with a current status of withdrawn. It is proposed to connect at West Owatonna-AL Corn Dist-Byron 161kV Line.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWest Owatonna-AL Corn Dist-Byron 161kV Line
Queue IDJ310
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateMinnesota
CountyDodge County,Steele County
Point of interconnectionWest Owatonna-AL Corn Dist-Byron 161kV Line
Requested (queue) date2017-06-16
Proposed in-service date2017-09-01
Operational date2017-09-01
Withdrawn date2019-02-11
Developer
Utility / transmission ownerSouthern Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata