West Queue Project Q116 — Battery in Clark, Nevada

West Queue Project Q116 — Battery in Clark, Nevada is a 400.0 MW battery interconnection project in Clark, Nevada with a current status of active. It is proposed to connect at McCullough 500kV Substation.

400.0 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project Q116 — Battery in Clark, Nevada
Queue IDQ116
Statusactive
Source statusactive
MarketWest
TechnologyBattery
Capacity400.0 MW
StateNevada
CountyClark
Point of interconnectionMcCullough 500kV Substation
Requested (queue) date2025-11-05
Proposed in-service date2032-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.