West Queue Project Q20 — Solar in Inyo, California

West Queue Project Q20 — Solar in Inyo, California is a 138.0 MW solar interconnection project in Inyo, California with a current status of withdrawn. It is proposed to connect at Owens Gorge - Rinaldi 230kV Line.

138.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q20 — Solar in Inyo, California
Queue IDQ20
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity138.0 MW
StateCalifornia
CountyInyo
Point of interconnectionOwens Gorge - Rinaldi 230kV Line
Requested (queue) date2011-10-03
Proposed in-service date2014-11-01
Operational date
Withdrawn date2015-04-01
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.