West Queue Project Q28 — Solar in San Bernardino, California

West Queue Project Q28 — Solar in San Bernardino, California is a 150.0 MW solar interconnection project in San Bernardino, California with a current status of withdrawn. It is proposed to connect at Mead-Victorville 287kV.

150.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q28 — Solar in San Bernardino, California
Queue IDQ28
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity150.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionMead-Victorville 287kV
Requested (queue) date2012-05-18
Proposed in-service date2015-11-01
Operational date
Withdrawn date2014-10-17
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata