West Queue Project Q41 — Solar in Yuma, Arizona

West Queue Project Q41 — Solar in Yuma, Arizona is a 250.0 MW solar interconnection project in Yuma, Arizona with a current status of withdrawn. It is proposed to connect at North Gila Substation.

250.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q41 — Solar in Yuma, Arizona
Queue IDQ41
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity250.0 MW
StateArizona
CountyYuma
Point of interconnectionNorth Gila Substation
Requested (queue) date2008-01-10
Proposed in-service date2012-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata