West Queue Project Q53 — Solar+Battery in Millard, Utah
West Queue Project Q53 — Solar+Battery in Millard, Utah is a 285.0 MW solar+battery interconnection project in Millard, Utah with a current status of active. It is proposed to connect at IPP 345kV Switchyard.
285.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project Q53 — Solar+Battery in Millard, Utah |
|---|---|
| Queue ID | Q53 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 285.0 MW |
| State | Utah |
| County | Millard |
| Point of interconnection | IPP 345kV Switchyard |
| Requested (queue) date | 2016-07-28 |
| Proposed in-service date | 2019-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Intermountain Power Agency |
| Utility / transmission owner | Los Angeles Department of Water and Power |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.