West Queue Project Q64 — Solar+Battery in Beaver, Utah

West Queue Project Q64 — Solar+Battery in Beaver, Utah is a 300.0 MW solar+battery interconnection project in Beaver, Utah with a current status of withdrawn. It is proposed to connect at 345kV Milford (IPP).

300.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q64 — Solar+Battery in Beaver, Utah
Queue IDQ64
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity300.0 MW
StateUtah
CountyBeaver
Point of interconnection345kV Milford (IPP)
Requested (queue) date2018-03-19
Proposed in-service date2020-11-30
Operational date
Withdrawn date2022-12-13
DeveloperIntermountain Power Agency
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata