West Queue Project Q84 — Battery in San Bernardino, California
West Queue Project Q84 — Battery in San Bernardino, California is a 500.0 MW battery interconnection project in San Bernardino, California with a current status of active. It is proposed to connect at Adelanto 500kV Switchyard.
500.0 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology
Project facts
| Canonical name | West Queue Project Q84 — Battery in San Bernardino, California |
|---|---|
| Queue ID | Q84 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Battery |
| Capacity | 500.0 MW |
| State | California |
| County | San Bernardino |
| Point of interconnection | Adelanto 500kV Switchyard |
| Requested (queue) date | 2021-10-18 |
| Proposed in-service date | 2024-05-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Los Angeles Department of Water and Power |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata