West Queue Project Q86 — Wind in Millard, Utah

West Queue Project Q86 — Wind in Millard, Utah is a 300.0 MW wind interconnection project in Millard, Utah with a current status of active. It is proposed to connect at IPP-Gonder 230kV Line.

300.0 MWCapacity
ActiveStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project Q86 — Wind in Millard, Utah
Queue IDQ86
Statusactive
Source statusactive
MarketWest
TechnologyWind
Capacity300.0 MW
StateUtah
CountyMillard
Point of interconnectionIPP-Gonder 230kV Line
Requested (queue) date2021-11-24
Proposed in-service date2025-10-01
Operational date
Withdrawn date
DeveloperIntermountain Power Agency
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata