West Queue Project Q96 — Solar+Battery in Los Angeles, California

West Queue Project Q96 — Solar+Battery in Los Angeles, California is a 1,000.0 MW solar+battery interconnection project in Los Angeles, California with a current status of active. It is proposed to connect at Scattergood 230kV Switchyard.

1,000.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q96 — Solar+Battery in Los Angeles, California
Queue IDQ96
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity1,000.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionScattergood 230kV Switchyard
Requested (queue) date2023-03-02
Proposed in-service date2030-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata