West Shawano 138kV - Badger 138kV (J1996)

West Shawano 138kV - Badger 138kV is a 99.0 MW solar interconnection project in Shawano, Wisconsin with a current status of withdrawn. It is proposed to connect at West Shawano 138kV - Badger 138kV.

99.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWest Shawano 138kV - Badger 138kV
Queue IDJ1996
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity99.0 MW
StateWisconsin
CountyShawano
Point of interconnectionWest Shawano 138kV - Badger 138kV
Requested (queue) date2021-08-11
Proposed in-service date2025-09-01
Operational date2025-09-01
Withdrawn date2024-10-01
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata