The interXdata warehouse tracks 7 interconnection projects in Shawano, Wisconsin, representing 572 MW of requested capacity.

7Total projects
0Active
1Operational
6Withdrawn
572 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3202 MW
Wind2160 MW
Gas1110 MW
Battery1100 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project G249 — Gas in Shawano, WisconsinG249Gas110.0 MWwithdrawnShawano, Wisconsin
Highway 22 345 kV SubstationJ2537Battery100.0 MWwithdrawnShawano, Wisconsin
West Shawano 138kV - Badger 138kVJ1996Solar99.0 MWwithdrawnShawano, Wisconsin
Highway 22 345 kV SubstationJ2544Solar95.0 MWwithdrawnShawano, Wisconsin
MISO Queue Project G332 — Wind in Shawano, WisconsinG332Wind80.0 MWwithdrawnShawano, Wisconsin
MISO Queue Project G333 — Wind in Shawano, WisconsinG333Wind80.0 MWwithdrawnShawano, Wisconsin
Bonduel Solar WI, LLC67726_20233Solar7.5 MWoperationalShawano, Wisconsin

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.