Westmorland Solar (1090)

Westmorland Solar is a 20.0 MW solar interconnection project in Oneida, New York with a current status of withdrawn. It is proposed to connect at Yahnundasis - Clinton 46 kV.

20.0 MWCapacity
WithdrawnStatus
EMarket
SolarTechnology

Project facts

Canonical nameWestmorland Solar
Queue ID1090
Statuswithdrawn
Source status0
MarketE
TechnologySolar
Capacity20.0 MW
StateNew York
CountyOneida
Point of interconnectionYahnundasis - Clinton 46 kV
Requested (queue) date2020-09-04
Proposed in-service date2024-03-31
Operational date
Withdrawn date
DeveloperSED NY Holdings LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.