WestRock Southeast, LLC. (54004_GEN2)

WestRock Southeast, LLC. is a 37.1 MW gas interconnection project in Laurens, Georgia with a current status of operational.

37.1 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameWestRock Southeast, LLC.
Queue ID54004_GEN2
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity37.1 MW
StateGeorgia
CountyLaurens
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1989-06-01
Withdrawn date
Developer
Utility / transmission ownerWestRock-West Point Mill

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata