WESTSIDE CANAL ENERGY CENTER (1437)

WESTSIDE CANAL ENERGY CENTER is a 425.0 MW solar+battery interconnection project in Imperial, California with a current status of withdrawn. It is proposed to connect at Imperial Valley Substation 230kV.

425.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameWESTSIDE CANAL ENERGY CENTER
Queue ID1437
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity425.0 MW
StateCalifornia
CountyImperial
Point of interconnectionImperial Valley Substation 230kV
Requested (queue) date2017-05-01
Proposed in-service date
Operational date
Withdrawn date2020-06-10
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata