Westside Energy Station (60564_WES1)

Westside Energy Station is a 9.3 MW gas interconnection project in Olmsted, Minnesota with a current status of operational.

9.3 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameWestside Energy Station
Queue ID60564_WES1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity9.3 MW
StateMinnesota
CountyOlmsted
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2018-03-01
Withdrawn date—
Developer—
Utility / transmission ownerRochester Public Utilities

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata