Westwood 345 kV (J2509)

Westwood 345 kV is a 200.0 MW wind interconnection project in Tippecanoe, Indiana with a current status of operational. It is proposed to connect at Westwood 345 kV.

200.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameWestwood 345 kV
Queue IDJ2509
Statusoperational
Source statusPending Revision Approval
Market
TechnologyWind
Capacity200.0 MW
StateIndiana
CountyTippecanoe
Point of interconnectionWestwood 345 kV
Requested (queue) date2022-09-15
Proposed in-service date2025-10-31
Operational date2025-10-31
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata