Wheatridge Hybrid (62745_BTRY)

Wheatridge Hybrid is a 30.0 MW battery interconnection project in Morrow, Oregon with a current status of operational.

30.0 MWCapacity
OperationalStatus
BPATMarket
BatteryTechnology

Project facts

Canonical nameWheatridge Hybrid
Queue ID62745_BTRY
Statusoperational
Source status(OP) Operating
MarketBPAT
TechnologyBattery
Capacity30.0 MW
StateOregon
CountyMorrow
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2022-03-01
Withdrawn date
Developer
Utility / transmission ownerWheatridge Wind Holdings, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata