Wheatridge Optimization II (70450_BA1)

Wheatridge Optimization II is a 60.0 MW battery interconnection project in Morrow, Oregon with a current status of active.

60.0 MWCapacity
ActiveStatus
BPATMarket
BatteryTechnology

Project facts

Canonical nameWheatridge Optimization II
Queue ID70450_BA1
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketBPAT
TechnologyBattery
Capacity60.0 MW
StateOregon
CountyMorrow
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerWheatridge Optimization II, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata