Wheelhouse Solar Energy Center (C24-188)

Wheelhouse Solar Energy Center is a 350.0 MW solar+battery interconnection project in Herkimer, New York with a current status of withdrawn. It is proposed to connect at Edic 345 kV to Princetown 345 kV circuit #352.

350.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameWheelhouse Solar Energy Center
Queue IDC24-188
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity350.0 MW
StateNew York
CountyHerkimer
Point of interconnectionEdic 345 kV to Princetown 345 kV circuit #352
Requested (queue) date2024-09-18
Proposed in-service date
Operational date
Withdrawn date
DeveloperWheelhouse Solar Energy Center, LLC
Utility / transmission ownerNYPA

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata