Whiskey Diggings (2259)

Whiskey Diggings is a 414.4 MW solar interconnection project in Sutter, California with a current status of active. It is proposed to connect at RIO OSO 230 kV.

414.4 MWCapacity
ActiveStatus
CAISOMarket
SolarTechnology

Project facts

Canonical nameWhiskey Diggings
Queue ID2259
Statusactive
Source statusactive
MarketCAISO
TechnologySolar
Capacity414.4 MW
StateCalifornia
CountySutter
Point of interconnectionRIO OSO 230 kV
Requested (queue) date2023-04-17
Proposed in-service date2030-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.