Whistiling Wings 69 kV Substation (J1429)

Whistiling Wings 69 kV Substation is a 24.0 MW battery interconnection project in Juneau County, Wisconsin with a current status of withdrawn. It is proposed to connect at Whistiling Wings 69 kV Substation.

24.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameWhistiling Wings 69 kV Substation
Queue IDJ1429
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity24.0 MW
StateWisconsin
CountyJuneau County
Point of interconnectionWhistiling Wings 69 kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2022-10-30
Operational date2022-10-30
Withdrawn date2020-05-18
Developer
Utility / transmission ownerDAIRYLAND POWER COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata