Whistling Duck I is a 75.0 MW solar interconnection project in Levy, Florida with a current status of operational.

75.0 MWCapacity
OperationalStatus
FPCMarket
SolarTechnology

Project facts

Canonical nameWhistling Duck I
Queue ID68595_OEFL8
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologySolar
Capacity75.0 MW
StateFlorida
CountyLevy
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-12-01
Withdrawn date—
Developer—
Utility / transmission ownerOrigis Energy USA, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.