Whistling Ridge (G108)

Whistling Ridge is a 70.0 MW wind interconnection project in Skamania, Oregon with a current status of withdrawn. It is proposed to connect at Midway-North Bonneville 230kV Transmission line.

70.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameWhistling Ridge
Queue IDG108
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity70.0 MW
StateOregon
CountySkamania
Point of interconnectionMidway-North Bonneville 230kV Transmission line
Requested (queue) date2002-06-24
Proposed in-service date2009-12-31
Operational date
Withdrawn date
DeveloperWhistling Ridge Energy, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata