White Oak 500 kV (F05_W38)

White Oak 500 kV is a 1,200.0 MW gas interconnection project in Unknown, Pennsylvania with a current status of withdrawn.

1,200.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameWhite Oak 500 kV
Queue IDF05_W38
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity1,200.0 MW
StatePennsylvania
CountyUnknown
Point of interconnection
Requested (queue) date2001-01-29
Proposed in-service date2004-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata