White Rock - Wayne 345 kV (AH1-147 - moved to TC2)

White Rock - Wayne 345 kV is a 200.0 MW solar interconnection project in Ogle, Illinois with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameWhite Rock - Wayne 345 kV
Queue IDAH1-147 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity200.0 MW
StateIllinois
CountyOgle
Point of interconnection—
Requested (queue) date2021-08-27
Proposed in-service date2029-10-31
Operational date—
Withdrawn date2025-11-21
Developer—
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.