White Rock-Wayne 345kV (AD1-064)

White Rock-Wayne 345kV is a 150.0 MW wind interconnection project in DeKalb, Illinois with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameWhite Rock-Wayne 345kV
Queue IDAD1-064
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity150.0 MW
StateIllinois
CountyDeKalb
Point of interconnection—
Requested (queue) date2017-08-25
Proposed in-service date2019-12-15
Operational date—
Withdrawn date2019-09-19
Developer—
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata