Whitetail BESS (26INR0420)

Whitetail BESS is a 180.0 MW other interconnection project in Mitchell, Texas with a current status of operational. It is proposed to connect at tap Salt Mine (#23846) to Bulldog (#23833) 138kV.

180.0 MWCapacity
OperationalStatus
MitchellMarket
OtherTechnology

Project facts

Canonical nameWhitetail BESS
Queue ID26INR0420
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMitchell
TechnologyOther
Capacity180.0 MW
StateTexas
CountyMitchell
Point of interconnectiontap Salt Mine (#23846) to Bulldog (#23833) 138kV
Requested (queue) date2024-02-27
Proposed in-service date
Operational date2029-06-08
Withdrawn date
DeveloperHunt Energy Network, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata