Whitlock Substation 230 kV (GEN-2020-093)

Whitlock Substation 230 kV is a 150.0 MW solar interconnection project in Potter County, South Dakota with a current status of withdrawn. It is proposed to connect at Whitlock Substation 230 kV.

150.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameWhitlock Substation 230 kV
Queue IDGEN-2020-093
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity150.0 MW
StateSouth Dakota
CountyPotter County
Point of interconnectionWhitlock Substation 230 kV
Requested (queue) date2020-04-30
Proposed in-service date2026-11-19
Operational date
Withdrawn date2023-04-13
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata