Wichita Falls Energy Storage (25INR0628)
Wichita Falls Energy Storage is a 202.0 MW other interconnection project in Archer, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1422 Bowman - 1458 Cobb Switch.
202.0 MWCapacity
OperationalStatus
ArcherMarket
OtherTechnology
Project facts
| Canonical name | Wichita Falls Energy Storage |
|---|---|
| Queue ID | 25INR0628 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Archer |
| Technology | Other |
| Capacity | 202.0 MW |
| State | Texas |
| County | Archer |
| Point of interconnection | Tap 345kV 1422 Bowman - 1458 Cobb Switch |
| Requested (queue) date | 2024-02-26 |
| Proposed in-service date | — |
| Operational date | 2028-08-01 |
| Withdrawn date | — |
| Developer | Wichita Falls Energy Storage LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-31 | developer | CSE Storage, LLC | Wichita Falls Energy Storage LLC | low |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.