Wieland Substation BESS Unit 1 (25INR0775)
Wieland Substation BESS Unit 1 is a 9.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at TSP SUBSTATION NAME: WEILAND SUBSATION_x000D_ TSP SUBSTATION CODE: WIELAND_RC_x000D_ LOAD NAME/LOAD TRANSFORMER NAME: TQE1/WIELD_RC_L_B_x000D_ BUS #PTI NUMBER: 6882_x000D_ VOLTAGE 138KV_x000D_ NODE: 3023.
Project facts
| Canonical name | Wieland Substation BESS Unit 1 |
|---|---|
| Queue ID | 25INR0775 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | — |
| County | — |
| Point of interconnection | TSP SUBSTATION NAME: WEILAND SUBSATION_x000D_ TSP SUBSTATION CODE: WIELAND_RC_x000D_ LOAD NAME/LOAD TRANSFORMER NAME: TQE1/WIELD_RC_L_B_x000D_ BUS #PTI NUMBER: 6882_x000D_ VOLTAGE 138KV_x000D_ NODE: 3023 |
| Requested (queue) date | 2025-03-13 |
| Proposed in-service date | 2026-01-27 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Telios Quinlan Energy One, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata