Wieland Substation BESS Unit 1 (25INR0775)

Wieland Substation BESS Unit 1 is a 9.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at TSP SUBSTATION NAME: WEILAND SUBSATION_x000D_ TSP SUBSTATION CODE: WIELAND_RC_x000D_ LOAD NAME/LOAD TRANSFORMER NAME: TQE1/WIELD_RC_L_B_x000D_ BUS #PTI NUMBER: 6882_x000D_ VOLTAGE 138KV_x000D_ NODE: 3023.

9.9 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameWieland Substation BESS Unit 1
Queue ID25INR0775
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity9.9 MW
State
County
Point of interconnectionTSP SUBSTATION NAME: WEILAND SUBSATION_x000D_ TSP SUBSTATION CODE: WIELAND_RC_x000D_ LOAD NAME/LOAD TRANSFORMER NAME: TQE1/WIELD_RC_L_B_x000D_ BUS #PTI NUMBER: 6882_x000D_ VOLTAGE 138KV_x000D_ NODE: 3023
Requested (queue) date2025-03-13
Proposed in-service date2026-01-27
Operational date
Withdrawn date
DeveloperTelios Quinlan Energy One, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata