Wildwood-Riverhead Energy Storage (0973)

Wildwood-Riverhead Energy Storage is a 293.5 MW battery interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Wildwood-Riverhead 138 kV.

293.5 MWCapacity
WithdrawnStatus
KMarket
BatteryTechnology

Project facts

Canonical nameWildwood-Riverhead Energy Storage
Queue ID0973
Statuswithdrawn
Source status0
MarketK
TechnologyBattery
Capacity293.5 MW
StateNew York
CountySuffolk
Point of interconnectionWildwood-Riverhead 138 kV
Requested (queue) date2020-01-13
Proposed in-service date2021-08-30
Operational date
Withdrawn date
DeveloperWildwood Energy Storage, LLC
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.