Wilkinson DeFore (Safari Energy) (65481_WD)

Wilkinson DeFore (Safari Energy) is a 3.0 MW solar interconnection project in Wilkinson, Georgia with a current status of operational.

3.0 MWCapacity
OperationalStatus
SOCOMarket
SolarTechnology

Project facts

Canonical nameWilkinson DeFore (Safari Energy)
Queue ID65481_WD
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologySolar
Capacity3.0 MW
StateGeorgia
CountyWilkinson
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2020-04-01
Withdrawn date—
Developer—
Utility / transmission ownerSafari Energy, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata