Willow Beach Wind (25INR0494)

Willow Beach Wind is a 202.3 MW other interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at Tap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4.

202.3 MWCapacity
OperationalStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameWillow Beach Wind
Queue ID25INR0494
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBrazoria
TechnologyOther
Capacity202.3 MW
StateTexas
CountyBrazoria
Point of interconnectionTap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4
Requested (queue) date2023-10-13
Proposed in-service date
Operational date2027-10-01
Withdrawn date
DeveloperCapital Wind, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata