Wilton (endpoint 1) to Bagley (endpoint 2) 115kV (S1055)

Wilton (endpoint 1) to Bagley (endpoint 2) 115kV is a 50.0 MW generation interconnection project in Beltrami, Minnesota with a current status of operational. It is proposed to connect at Wilton (endpoint 1) to Bagley (endpoint 2) 115kV.

50.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameWilton (endpoint 1) to Bagley (endpoint 2) 115kV
Queue IDS1055
Statusoperational
Source statusActive
Market
TechnologyGeneration
Capacity50.0 MW
StateMinnesota
CountyBeltrami
Point of interconnectionWilton (endpoint 1) to Bagley (endpoint 2) 115kV
Requested (queue) date2024-07-09
Proposed in-service date2026-08-01
Operational date2026-08-01
Withdrawn date
Developer
Utility / transmission ownerOtter Tail Power Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.