Wilton (endpoint 1) to Bagley (endpoint 2) 115kV (S1055)
Wilton (endpoint 1) to Bagley (endpoint 2) 115kV is a 50.0 MW generation interconnection project in Beltrami, Minnesota with a current status of operational. It is proposed to connect at Wilton (endpoint 1) to Bagley (endpoint 2) 115kV.
50.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology
Project facts
| Canonical name | Wilton (endpoint 1) to Bagley (endpoint 2) 115kV |
|---|---|
| Queue ID | S1055 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Generation |
| Capacity | 50.0 MW |
| State | Minnesota |
| County | Beltrami |
| Point of interconnection | Wilton (endpoint 1) to Bagley (endpoint 2) 115kV |
| Requested (queue) date | 2024-07-09 |
| Proposed in-service date | 2026-08-01 |
| Operational date | 2026-08-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Otter Tail Power Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata