Windom (2023_CAT3)

Windom is a 1.8 MW other interconnection project in Cottonwood, Minnesota with a current status of operational.

1.8 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameWindom
Queue ID2023_CAT3
Statusoperational
Source status(SB) Standby/Backup: available for service but not normally used
MarketMISO
TechnologyOther
Capacity1.8 MW
StateMinnesota
CountyCottonwood
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2001-04-01
Withdrawn date
Developer
Utility / transmission ownerCity of Windom (MN)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata