Windtalker 230 Substation (GI-CS-2025-26)

Windtalker 230 Substation is a 199.0 MW wind interconnection project in Kit Carson County,, Colorado with a current status of active. It is proposed to connect at Windtalker 230 Substation.

199.0 MWCapacity
ActiveStatus
COMarket
WindTechnology

Project facts

Canonical nameWindtalker 230 Substation
Queue IDGI-CS-2025-26
Statusactive
Source statusFACILITY STUDY STAGE
MarketCO
TechnologyWind
Capacity199.0 MW
StateColorado
CountyKit Carson County,
Point of interconnectionWindtalker 230 Substation
Requested (queue) date2025-10-02
Proposed in-service date2029-06-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-22operational_date2029-06-30—medium
2026-09-22proposed_online_date—2029-06-30medium
2026-09-22statusoperationalactivehigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.