Windthorst-2 (59238_WND2)

Windthorst-2 is a 67.6 MW wind interconnection project in Archer, Texas with a current status of operational.

67.6 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameWindthorst-2
Queue ID59238_WND2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity67.6 MW
StateTexas
CountyArcher
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2014-09-01
Withdrawn date—
Developer—
Utility / transmission ownerEDF Renewable Asset Holdings, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.