Winger 115kV Substation (J1081)

Winger 115kV Substation is a 300.0 MW wind interconnection project in Polk County, Minnesota with a current status of withdrawn. It is proposed to connect at Winger 115kV Substation.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWinger 115kV Substation
Queue IDJ1081
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateMinnesota
CountyPolk County
Point of interconnectionWinger 115kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date2019-03-28
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata