WOE Gyp King Wind (25INR0401)

WOE Gyp King Wind is a 304.3 MW other interconnection project in King, Texas with a current status of operational. It is proposed to connect at Tap 138kV 33798 GYP_18 – 6088 BENJ4A.

304.3 MWCapacity
OperationalStatus
KingMarket
OtherTechnology

Project facts

Canonical nameWOE Gyp King Wind
Queue ID25INR0401
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketKing
TechnologyOther
Capacity304.3 MW
StateTexas
CountyKing
Point of interconnectionTap 138kV 33798 GYP_18 – 6088 BENJ4A
Requested (queue) date2023-04-19
Proposed in-service date
Operational date2030-08-31
Withdrawn date
DeveloperKSK Wind Farm 1, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata